Home / Programmes / Vortex hydro energy
Coming soonVortex hydro energy
Small-scale power from flowing water, for the places that need it most.
Starting soon
Our programmes are being prepared now. None of them is running yet. We will share real news, with real photos, as each one begins.

Power from a whirlpool
We take part of the river along a short channel into a round concrete basin. The water swirls down a hole in the floor and forms a strong whirlpool. A slow turbine sits in the middle of it and turns a generator. Every drop goes straight back into the river.
There's no dam and no reservoir. It works with a drop of only half a metre to three metres, where most hydro power needs far more.
Why it matters
- It runs day and night. As long as the river flows, it makes power. Solar stops at sunset; this doesn't.
- No fuel to buy. In remote parts of Indonesia diesel can cost up to four times its normal price. The river is free.
- No dam. The river keeps flowing the way it always has.
- Designed to be fish-friendly. The turbine turns slowly, about 50 to 200 times a minute, and laboratory tests with live fish found no significant harm.
- Simple to build and look after. Local workers can build most of the basin, and leaves and sticks pass through.
- It grows in steps. One turbine runs a farm; a line of them along a river can run a whole village and more.
Our first site
We've measured the water flow and the drop. There's enough for about 5 kilowatts per turbine, running around the clock: about 120 kilowatt-hours a day from each one. The area has room for many more turbines.
Why Aceh needs it
Almost every home in Aceh is connected to the grid. The problem is that the power keeps cutting out.
On 22 May 2026 the whole province went dark, and the power failed again three days later. In late September 2025, 16 districts were without power for up to three days. In November 2025, floods brought down 12 transmission towers.
When the power goes, shops and workshops burn fuel in generators or shut their doors.
What steady power does for a village
It's been done before in Indonesia: in one programme with the national power company, 66,000 rural businesses invested in electric equipment and 22,000 jobs were created.
- Irrigation pumps that run on river power instead of diesel.
- Cold storage, so fish and milk keep instead of spoiling.
- Machines to dry and process crops, so farmers sell more and waste less.
- Light for children to study at night.
- Reliable power for clinics and health posts.
- Workshops and small businesses that can plan on power being there.
- Phones and internet that stay on.
The first in Sumatra, as far as we know
We searched in English and Bahasa Indonesia and found no vortex power plant anywhere in Aceh or Sumatra. A handful exist elsewhere in Indonesia, in Bali and East Java. That makes ours among the first in the country.
What it powers
Our first turbines will power the goat farm and the small social enterprises we're starting with local cooperatives. Those cooperatives will sell straight to buyers, without middlemen, and bring money into Aceh from outside.
Who builds it
Australian and Japanese engineers, including hydraulic engineers, working with Australian and Japanese tradespeople, in collaboration with local universities.
Made in Aceh
The first parts will come from China to keep costs down. Then we'll move manufacturing to Aceh, so the project can keep itself going and create local jobs and income. Everything is built to Japanese and Australian standards.
Paid for privately, built for the grid
The project is privately funded. We're talking with government, and we plan to sell surplus power to the national grid under Indonesia's renewable energy rules (Presidential Regulation 112 of 2022).
Clean energy goals
It supports the United Nations goals for clean energy (SDG 7) and climate action (SDG 13), the Paris Agreement, and Indonesia's target of net zero emissions by 2060 or sooner.
When
We plan to start building in 2027.
Sources
- How vortex plants work: International Journal of Fluid Machinery and Systems
- 36 vortex plants worldwide compared: Energies (MDPI), 2023
- Fish tests at TU Dresden: IAHR
- Diesel prices in remote Indonesia: Environment, Development and Sustainability, 2024
- Aceh blackout, 22 to 25 May 2026: detikNews
- Aceh outages, September 2025: detik Sumut
- Flood damage to towers, November 2025: Ministry of Energy (ESDM)
- 66,000 rural businesses, 22,000 jobs: World Bank
- Vortex plant in Bali: Turbulent
- Village vortex plant in East Java: Trilogi journal
- Aceh household electrification: PLN rural electrification seminar
- Selling renewable power: Presidential Regulation 112/2022 summary
- SDG 7: United Nations
- Paris Agreement: UNFCCC
- Indonesia's Second NDC, 2025: UNFCCC